Unit Hanging
• Confirm the pitch of the hanging rod is 790.0mm X 620.5mm (MCK-A) / 600.0mm x 582.0 mm (MCK-B).
• Hold the unit and hang it on the hanging rod with the nut and washer.
• Adjust the unit height to 35.0 mm between the indoor unit bottom surface and the ceiling surface.
• Confirm with a level gauge that the unit is installed horizontally and tighten the nut and bolt to prevent unit
falling and vibration.
• Open the ceiling board along the outer edge of the paper installation template.
Drain Piping Work
• Drain pipe must be downward gradient for smooth
drainage.
• Avoid the drain pipe from up and down slope to prevent
reversal flow.
• During the drain piping connection, be careful not to exert
extra force on the drain connector at indoor unit.
• The outside diameter of the drain connection at the
flexible drain hose is 20mm.
• Be sure to provide heat insulation (polyethylene foam with
thickness more than 8.0mm) on the drain piping to avoid
the condensed water dripping inside the room.
Note: This indoor unit use drain pump for condensed water drainage. Installed
the unit horizontally to prevent water leakage or condensation around
the air outlet.
121
35.0mm (MCK - A/ B)
30.0mm (MCK-C)
MCK-A/B/C
Drain Test
• Drain pipe must be downward gradient for smooth drainage.
• Feed water from flexible drain hose and check the piping for
leakage.
• When the test is completed, connect the flexible drain hose to
the drain connector on the indoor unit.
Ceiling
Board