11. VACUUMING AND CHARGING
PURGING THE PIPING AND THE INDOOR UNIT
Except for the outdoor unit which is pre-charged with
refrigerant, the indoor unit and the refrigerant
connection pipes must be air-purged because the
air containing moisture that remains in the refrigerant
cycle may cause malfunction of the compressor.
Remove the caps from the valve and the service
port.
Connect the center of the charging gauge to
the vacuum pump.
Connect the charging gauge to the service port
of the 3-way valve.
Start the vacuum pump. Evacuate for
approximately 30 minutes. The evacuation time
varies with different vacuum pump capacity.
Confirm that the charging gauge needle has
moved towards -760mmHg.
Caution
If the gauge needle does not move to -
760mmHg, be sure to check for gas leaks (using
the refrigerant detector) at flare type connection
of the indoor and outdoor unit and repair the
leak before proceeding to the next step.
Close the valve of the charging gauge and stop
the vacuum pump.
On the outdoor unit, open the suction valve (3
way) and liquid valve (2 way) (in anti-clockwise
direction) with 4mm key for hexagon sacked
screw.
ADDITIONAL CHARGE
The refrigerant is pre-charged in the outdoor unit. If
the piping length is less than 7.62m (25ft), then addi-
tional charge after vacuuming is not necessary. If the
piping length is more than 7.62m (25ft), then use the
additional charge value as indicated in the table.
CHARGE OPERATION
This operation must be done by using a gas cylinder
and a precise weighing machine. The additional
charge is toppedup into the outdoor unit using the
suction valve via the service port.
Remove the service port cap.
Connect the low pressure side of the charging
gauge to the suction service port center of the
cylinder tank and close the high pressure side
of the gauge. Purge the air from the service
hose.
Start the air conditioner unit.
Open the gas cylinder and low pressure charg-
ing valve.
When the required refrigerant quantity is
pumped into the unit, close the low pressure
side and the gas cylinder valve.
Disconnect the service hose from service port.
Put back the service port cap.
Additional charge per meter
The additional refrigerant charge amount
recommended is a guideline for long piping
application. The actual charge required may be
different from the guideline due to different application
and variation in site condition.
MODEL R410A
M5WMX 010/015/020/025 GR 19.5 g/m
Seitenansicht 35
1 2 ... 31 32 33 34 35 36 37 38 39 40 41 ... 50 51

Kommentare zu diesen Handbüchern

Keine Kommentare